Sign In | Join Free | My benadorassociates.com
China WUXI CHENENG ENVIRONMENTAL ENGINEERING & EQUIPMENT CO.,LTD logo
WUXI CHENENG ENVIRONMENTAL ENGINEERING & EQUIPMENT CO.,LTD
WUXI CHENENG ENVIRONMENTAL ENGINEERING & EQUIPMENT CO.,LTD Environmental solution
Site Member

11 Years

Home > Dissolved Air Flotation >

5-100m3 / H Dissolved Air Flotation Unit Equipment In Sewage Pretreatment

WUXI CHENENG ENVIRONMENTAL ENGINEERING & EQUIPMENT CO.,LTD
Contact Now

5-100m3 / H Dissolved Air Flotation Unit Equipment In Sewage Pretreatment

Brand Name : CHENENG

Model Number : ORF

Certification : CE/ISO

Place of Origin : China

MOQ : 1pcs

Price : negotiation

Payment Terms : L/C, T/T

Supply Ability : 10pcs per month

Delivery Time : 30 working days after received your payment

Packaging Details : nude packing, bulk packed in wooden cases

Product Name : Cavitation air flotation

Application : Water treatment

Maintain : PLC/non PLC

Standard : ISO

capacity : 1-500m³/h

Service life : 30 years

Contact Now

5-100m3/h dissolved air flotation equipment in sewage pretreatment

Performance Feature

--Big treatment ability, high efficiency, small space.

-- Simple structure, easy installation.

-- Eliminating the sludge expansion.

-- Aeration can eliminate water surface activating and smell, at the same time increase water dissolved oxygen.

--Air Floating is better effect specially for low temperature, low turbid, more algae water.

Company Introduction

1, The biggest water treatment equipment factory in WUXI

2, Top technology and research team with many patents.

3, Product category is complete, attaining domestic and foreign standards, application for many industries and districts.

4, Professional sale team formulates the perfect water treatment plan as every customer’s condition and requirement.

5, After sale service system is always preparation for every support needed.

FAQ

Q:Are you a factory or trading company

A: factory

Q:How to buy your idea products?

A:please supply water sources, water quality, flow rate and ground area (connect us for more details).

Q:How to pay?

A: TT and L/C paypal, etc. 30% deposit before producing, 70% balance before loading by TT.

Q:What is the delivery time?

A: It depends on order quantities. Generally speaking, the delivery time will be within 1-3 weeks.

Q: How to pack the products?

A: carton or wooden package usually.

Q: How to keep your equipments from corrosion?

A: Good paint, like SigmaCoatings,PainBow,etc. paint strictly according to the standard process.

Q: How do you manufacture your equipment ?

A:Our machining technology includes laser/plasma cutting, automatic welding,CNC cutting and bending.

Q:How to install after the equipments arriving destination?

III. CAF Specification

Type
size

Treatment
capacity

Tank
Length
(mm)

Tank
Width
(mm)

Tank
Depth
(mm)

Aerator
power
(kw)

Skimmer
power
(kw)

ORF-1

1m³/h

1400

550

1100

0.37

0.18

ORF-3

3 m³/h

2500

800

1300

1.5

0.37

ORF-5

5 m³/h

2500

1000

1300

1.5

0.37

ORF-10

10 m³/h

3000

1200

1300

2.2

0.37

ORF-15

15 m³/h

4000

1200

1300

2.2

0.37

ORF-20

20m³/h

5000

1200

1300

2.2

0.37

ORF-30

30m³/h

5000

1600

1800

2.2

0.37

ORF-40

40m³/h

6000

1600

1800

2.2

0.37

ORF-50

50m³/h

6000

1800

1800

4.4

0.37

ORF-75

75m³/h

7000

2400

1800

4.4

0.55

ORF-100

100m³/h

8000

2400

1800

4.4

0.55

ORF-150

150 m³/h

11500

2400

1800

6

0.55

ORF-200

200m³/h

15000

2400

1800

9

0.55

ORF-300

300 m³/h

15000

3100

1800

12

0.55

ORF-400

400m³/h

17000

3600

1800

12

0.55

ORF-500

500m³/h

21000

4500

1800

15

1.10


Product Tags:

dissolved air flotation equipment

      

dissolved air flotation for water clarification

      
Quality 5-100m3 / H Dissolved Air Flotation Unit Equipment In Sewage Pretreatment for sale

5-100m3 / H Dissolved Air Flotation Unit Equipment In Sewage Pretreatment Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: WUXI CHENENG ENVIRONMENTAL ENGINEERING & EQUIPMENT CO.,LTD
*Subject:
*Message:
Characters Remaining: (0/3000)